Scope of Works: As part of the redevelopment of the Cashel Palace Hotel, ESK carried out the essential civil works to support the project’s transformation. Our scope included site mobilisation, structural modifications, site clearance, grading, and the installation of stormwater and sewer drainage systems. We carefully managed access and traffic control, ensuring minimal disruption to the surrounding area while maintaining the highest safety standards. Precision excavation, temporary works, and protective measures were implemented to safeguard existing structures.
Scope of Works: For the construction of this 100m x 20m multipurpose storage facility, ESK delivered a full turnkey civil works package in just 7 weeks. Our scope included site clearance and grading to establish proper levelling and drainage, installation of concrete pads for structural support, and laying robust foundations for both the shed base and front yard. We erected the main structural framework, installed exterior sheeting and roofing, and completed the project with high-quality concrete yard surfacing and kerbing. From groundwork to final finishes, we ensured a durable and functional facility, executed with efficiency and precision.
Scope of Works: ESK was entrusted with the civil works for the construction of a new formulation research and development facility within a live pharmaceutical plant in Ballydine, Tipperary. Working under a strict schedule, we executed all groundwork, foundations, structural concrete works, and site development to the highest standards. Our team ensured minimal disruption to ongoing operations while maintaining the highest safety and quality standards. This project showcased our ability to deliver complex civil works in highly controlled environments, meeting the stringent requirements of the pharmaceutical industry.
Scope of Works: ESK was responsible for the construction and upgrading of gallops, including the installation of a full lighting system. Our scope of work involved trench excavation and the installation of ESB ducting, bases, and sleeves for light poles. Additionally, we carried out the upgrade and construction of all-weather gallops, incorporating a comprehensive drainage and ducting system to ensure optimal performance and durability. This project demonstrated our expertise in delivering high-quality infrastructure for equestrian facilities, meeting the highest industry standards
Scope of Works: ESK delivered essential plant upgrades at Medite Clonmel, including the construction of an ash pit extension to support environmental improvements. Built to enhance sustainability and compliance, the extension plays a key role in the plant’s waste management. In addition, we maintain an ongoing partnership for the levelling of the woodchip pile, ensuring efficient material handling. As close neighbours, we take pride in contributing to the plant’s long-term environmental and operational goals.
Scope of Works: ESK delivered key plant upgrades at Bulmers Clonmel, enhancing site infrastructure and operational efficiency. Our scope of work included the construction of foundations and new internal roadways, extensive excavation and grading for drainage and attenuation systems, and the installation of kerbing and service ducting. Working within an active facility, we implemented strict traffic and pedestrian management controls to ensure safety and minimal disruption. Our expertise in civil works and project coordination ensured the successful completion of these upgrades, supporting the continued operations of one of Ireland’s leading beverage producers.