Client:
Main Contractor: ESK Plant Ltd
Contract Duration:
The project was constructed and developed using recycled soils. The lagoon was designed and formed to blend seamlessly into an existing valley. The finished storage capacity of the lagoon is 16 million litres of water
Scope of Works
© 2024 ESK | All Rights Reserved